FlashFix Pro Start free trial

FF Software for window, door and conservatory companies

From first call
to final fit.

One app runs the whole job. Design it in 3D in the customer’s home, get it signed on their phone, then survey, make and fit it from the same record.

Start free trial See a window built

No card. Up to five people.3

  • 173D designers, one for each product
  • 241colours and woodgrain foils1
  • 7regulation checks, each one named2
  • 20order stages, from signature to paid

Drawn in FlashFix1930s semi-detached pair

01Design9 steps

Draw a window. Watch it build.

This is the designer your reps use. Sized to the millimetre and priced from your rates at every step.

Build sheetW1 · Living room · uPVC casement

  1. 01Draw the elevation1800 × 1200
  2. 02The frame comes off the drawingWelded corners
  3. 03Draw in two mullionsThree panes
  4. 04Glaze the fixed lightClear
  5. 05Add the openersLeft and right
  6. 06Add astragal barsSix lights a pane
  7. 07Try the colour on it
  8. 08White inside, handles onDual colour
  9. 09Open it, priced as you goYour rates
  1. The elevation drawn as lines on a grid.01 Draw the elevation.
  2. The white frame in 3D with two mullions and the centre pane glazed.03 Draw in two mullions.
  3. Side-hung openers fitted left and right, and astragal bars on every pane.06 Add astragal bars.
  4. The finished window in Chartwell Green.07 Try the colour on it.

02UK homes20 homes and streets

On their kind of house.

Show the customer their own kind of home, not a sample in a showroom. The roofline designer builds it, and every window and door on it comes from the window and door designers.

A street of yellow-brick Victorian terraced houses with slate roofs, white bay windows with sliding sashes, arched doorways and iron railings.

Drawn in FlashFixVictorian terraced street

  1. 1RooflineFascias and gutters, measured off the house.Roofline designer
  2. 2Bay windowsCanted bays with sliding sashes, each facet sized on its own.Bay and sash designers
  3. 3Front doorsComposite, uPVC or aluminium, with the glass and furniture you’d fit.Door designers
  4. 4Sash windowsThe split, the horns and the bars, as you’d quote them.Sash window designer

+ Eight more of the twenty

  • A red-brick Victorian terrace with white sash windows and blue front doors.

    Victorian terrace

  • A yellow-brick London terrace with a slate mansard roof, white sash windows and black front doors behind iron railings.

    London mansard terrace

  • A red-brick chalet bungalow with dormer windows in its tiled roof, white windows and a white front door.

    Chalet bungalow

  • A pair of red-brick 1950s semis with red front doors.

    1950s semi

  • A 1970s detached house with tile-hung first floor, a blue door and a white garage door.

    1970s detached

  • A 1990s estate detached house with a door canopy and a white garage door.

    1990s detached

  • A hipped bungalow with white leaded windows and a green front door.

    Hipped bungalow

  • A four-storey Georgian terrace with tall white sash windows.

    Georgian terrace

03Rules and regs7 rules

Built to the Building Regulations.

  1. B

    Fire escapeAn upstairs bedroom needs an escape window: a clear opening at least 450 mm each way and 0.33 m², no more than 1100 mm up, on egress hinges.

  2. K

    Protection from fallingAn upstairs opening less than 800 mm above the floor gets guarding to 800 mm, or restrictors to 100 mm where building control accepts them.

  3. K

    Safety glassGlass within 800 mm of the floor, and in or beside a door up to 1500 mm, must be toughened or laminated.

  4. F

    Trickle ventsEnough background ventilation for the room, and never less than its old windows had.

  5. L

    EnergyA replacement window reaches a U-value of 1.4 W/m²K or better.

  6. M

    Level accessA door with level access keeps it: a low or level threshold.

  7. PD

    Porches and conservatoriesThe designers show a planning and Building Regulations badge as you go. A porch under 3 m², under 3 m high and over 2 m from a road is likely permitted development.

The survey checks every window and door against these as it’s measured, names the rule, and flags anything that changes the contract.2

04The range17 designers

A designer for everything you fit.

Each product has its own 3D designer that knows how it’s made, how it opens and how it’s priced. Every one comes in 215 RAL colours and 26 foils.1 Pick one to watch it built.

05QuoteA page a product

A quote they can’t misread.

  1. aEverything on one page: every product and extra, the VAT and the deposit, added up.
  2. bA page for every product, drawn to size, with its room, colour, glass and price.
  3. cWhat it costs and when they pay, in stages that follow the work.
  4. dReady to go ahead: their right to cancel, then their signature.

Built while you design. Print it, or send it as a link.

06 Lead to order

From first call to signed order.

Six hand-overs, one record. Every screen here is FlashFix itself, recorded on demo data.4

  1. 01 Canvasser · on their own phone

    The lead, taken on the doorstep.

    A canvasser adds the enquiry there and then: who, where and what they want.

    • Checked for duplicates
    • Scored
    • On the bell list

    Lead created by the canvasser.

    A phone showing the Capture a new lead form being filled in: name, phone number, property and postcode.
  2. 02 Beller · at their desk

    Rung, logged and booked.

    The beller works the list. Every call is on the record, and a booked visit drops into the rep’s diary with the beller’s note attached.

    • Contacted
    • Visit booked
    • Reminder set, with the address

    Phone: confirmed appointment. Visit booked for Thursday, 18:30.

    A lead’s record: its journey from enquiry to signed, then its timeline with the call, the beller’s note and the booked visit.
  3. 03 Sales rep · in the customer’s home

    A presentation that starts informed.

    The beller’s notes are on the first page. The customer picks what matters most to them, and the Treating Customers Fairly steps come before any price.

    • Arrival logged
    • Fair-treatment steps done
    • Their priorities recorded

    Sales rep arrived on site. Presentation started.

    The presentation: the customer’s details, then What matters most to you with three priorities chosen.
  4. 04 Sales rep · on the sofa

    Designed in front of them, priced as you draw.

    Draw each window and door to size, in 2D and in 3D. The price builds from your own rates as you go, so the quote is ready when the drawing is.

    • Drawn to size
    • Priced from your rates
    • Quote presented

    Quote Q-261013-01 presented: £4,378.

    The window designer: a casement sized, split into panes with openers, then shown in 3D with its running price.
  5. 05 The customer · on their own phone

    Signed on their sofa.

    The quote arrives as a link. They read it again, see their right to cancel, type their name and tick Sign and accept. No app, no printer.

    • Quote read
    • Right to cancel shown
    • Signed and accepted

    Not signed yet? FlashFix reminds the rep at 24 and 48 hours, then the branch manager at 96.5

    Signed online by the customer.

    The customer’s phone: their quotation, what it costs, their right to cancel, then their typed name and Sign and accept.
  6. 06 FlashFix · on its own

    The order makes itself.

    Nobody types it up. The moment they sign, the job is on the orders board with everything the office needs.

    Order O-261013-01 raised. Deposit of £438 due.

07 Order to completion

From signed order to final fit.

Twenty stages in six phases, every one named here. Dashed only when the job needs it, amber when something goes wrong.

  1. 01 Office · phase 1 of 6, Sales

    Approved, with nothing missing.

    The order lands at Purchase Order. Each move asks for what it needs before it lets go, and you decide who may make it.

    • Purchase Order
    • Pending Approval
    • Sales Query
    • Contract Variation

    Approved by the office. Deposit recorded.

    The orders board on its Sales phase: orders at Pending Approval, Sales Query and Contract Variation, each with its next action.
  2. 02 Surveyor · phases 2 and 3, Survey and Compliance

    Measured once, checked as they go.

    The survey runs step by step on a tablet and checks the Building Regulations on the way. No signal? It saves on the tablet and syncs later. If it changes the job, the order goes to Contract Variation, not the factory.

    • Pending Survey
    • Survey Approval
    • Survey Rejection
    • Asbestos Testing
    • Asbestos Removal
    • Planning Permission

    Survey signed off. Measurements confirmed, no changes.

    The survey workspace on its arrival step, with property, access, hazards, items, works, fitting plan, changes and sign-off to follow.
  3. 03 Office and factory · phase 4, Manufacture

    To the factory, with the surveyed sizes.

    Nothing is released until the survey is signed off and any change is signed by the customer. Then the board follows it through manufacture to a delivery date.

    • Pending Manufacture
    • In Manufacture

    Released to manufacture with the surveyed sizes.

    The orders board on its Manufacture phase: orders at Pending Manufacture and In Manufacture.
  4. 04 Fitters · phase 5, Install

    Fitted, with the job in their pocket.

    Fits, surveys and remedials share one diary, with the address and the job one tap away. Building work or scaffolding gets its own stage when the job needs it.

    • Pending Installation
    • Building Work / Scaffolding
    • Installed

    Fitted. Photos added to the job.

    A week on the diary: installations, surveys and sales visits for every day, each with its address and who is going.
  5. 05 Office · phase 6, Payment and Close

    Paid, closed and on the record.

    Deposit, stage payments and balance sit on one ledger, and payments export to Xero. When the balance is in, the job closes.

    • Payments
    • Complete
    • Payment Query / Legal
    • Cancellations
    • Refund Authorised

    Balance of £3,940 taken. Complete.

    An order’s Money tab: the order total, what has been received and what is outstanding, with the deposit received and the balance due.

FFWhat changes9 hand-overs

Nothing typed twice.

On paper, a job is typed again every time it changes hands. Here is each hand-over, without FlashFix and with it.

  1. ALead

    Without FlashFix: A name on a clipboard, typed up that evening.

    With FlashFix: On the canvasser’s phone at the door, checked for duplicates.

  2. BAppointment

    Without FlashFix: A diary entry and a phone call to the rep.

    With FlashFix: In the rep’s diary, with the beller’s note on the first page.

  3. CPrice

    Without FlashFix: A price list, a calculator and a call to the office.

    With FlashFix: Priced from your own rates as each window is drawn.

  4. DQuote

    Without FlashFix: Typed up the next day and posted.

    With FlashFix: Ready when the drawing is. Printed, or sent as a link.

  5. ESignature

    Without FlashFix: A paper contract, chased by phone.

    With FlashFix: Signed on their own phone, with reminders at 24, 48 and 96 hours.5

  6. FOrder

    Without FlashFix: Typed again from the contract into the order book.

    With FlashFix: Raised the moment they sign. Nobody types it.

  7. GSurvey

    Without FlashFix: A paper sheet, read back at the office.

    With FlashFix: On a tablet, checked against the regulations, with or without signal.

  8. HFitting

    Without FlashFix: A whiteboard and a group chat.

    With FlashFix: One diary for fits, surveys and remedials.

  9. IPayment

    Without FlashFix: A spreadsheet of who owes what.

    With FlashFix: One ledger for each order, exported for Xero.

08Team6 seats

Built for every seat on the job.

Each person gets the screens their job needs, and nothing else. Pick a seat.

Canvassers book the visit and leave a note for the rep. It’s on the first page of their presentation.

  • Leads taken on their own phone
  • Duplicates caught at the door
  • A note that reaches the rep
Prospect cards, each with Start presentation, Manage and Bell buttons.

Sales reps present, design, price and sign in one sitting, on the sofa, not back at the office.

  • The beller’s notes on page one
  • A price that builds as they draw
  • A signature on the customer’s phone
The product showroom with casement, aluminium, flush, tilt and turn, sash, shaped and bay windows.

Surveyors measure once, on the tablet, with the regulations checked as they go. The order can’t reach the factory until the survey is signed off.

  • A survey that runs step by step
  • The regulations checked as they measure
  • No signal needed
A survey on its arrival step, asking who will sign it off.

The office gets approvals, deposits and bookings queued in order. Payments export to Xero.

  • A work queue, in order
  • Deposits and stage payments on one ledger
  • Payments exported for Xero
The work queue, showing what needs doing next.

Fitters see fits, surveys and remedials on one diary, with the address and the job one tap away.

  • One diary for fits, surveys and remedials
  • The address and the job one tap away
  • Photos added to the job
The calendar with an installation for Liam Doherty and a customer appointment.

Managers and owners see business won, new leads and what’s still to close for every branch, live, and set the rules for who may do what.

  • Business won and leads, branch by branch
  • Who may do what, set by you
  • Every change on the record
The performance dashboard: business won, new leads, revenue and pipeline charts.

09Security and compliance6 safeguards

Locked down. On the record.

  1. Passkeys and two-factorSign in with a fingerprint, a face or a code from an app.

  2. Each branch, its own workBranches see their own leads and orders. Managers see what you let them.

  3. Roles that fit the jobCanvassers, reps, surveyors, office and managers each get the screens they need.

  4. Fair from the first minuteTreating Customers Fairly steps run before every presentation.

  5. Cooling-off, written inYour cooling-off period goes into every contract, and the customer sees it before they sign.

  6. Every change on the recordWho did what, and when, on every lead and every order.

FFSpecification26 lines

Everything in the box.

The whole platform in four parts, line by line. Each one comes with a screen from that part of the app.4

ADesign

Designers
17, one for each product: casement, flush, tilt and turn, aluminium, sash, shaped and bay windows; composite, uPVC, stable, arched, aluminium, bifold and patio doors; conservatories, porches and roofline.
Colours
215 RAL Classic colours and 26 foils. Outside and inside are set separately.1
Glass
Chosen pane by pane: clear, obscure, toughened, laminated or decorative.
Bars and lead
Georgian and astragal bars. Diamond and square lead.
Hardware
Handles, letterplates, knockers, trickle vents and cat flaps, placed where they’re fitted.
Sizes
Typed in millimetres, or drawn with a finger.
Homes
20 UK homes and streets to show it on.
The conservatory designer: a white Victorian conservatory on dwarf walls against a brick house, the design menu down the left, and badges reading Building Regs, may be exempt, and Planning, check the planning route.

Recorded in the appConservatory designer

Every designer is 3D, and the big ones check themselves: this conservatory shows its Building Regulations and planning position as it is drawn.

BSell

Leads
Taken on a phone, checked for duplicates, scored and put on the bell list.
Presentation
Opens with the beller’s notes and the Treating Customers Fairly steps.
Pricing
From your own rates: a size matrix, price bands or a rate card for each product, with your options and extras.
Quote
A page for every product, the payment stages and the right to cancel. Printed, or sent as a link.
Signature
On the customer’s own phone, by typed name. Reminders at 24, 48 and 96 hours.5
Changes
A changed contract is signed again, and the order total follows the signatures.
The sales report: bookings, average deal, win rate and sales cycle across the top, above a funnel that runs from 74 leads captured to 22 sold and 16 installed.

Recorded in the appSales report

From the first knock to the signature, and what became of every lead on the way.

CRun the job

Orders
20 named stages in 6 phases. You set who may make each move.
Survey
Step by step on a tablet. Saves with no signal and syncs later.
Regulations
7 rules checked and named as the survey is measured.2
Diary
Fits, surveys, remedials and sales visits in one calendar.
Money
Deposit, stage payments and balance on one ledger for each order. Exports for Xero.
Work queue
What needs doing next, for each role.
Reports
Business won, leads and revenue, branch by branch.
The operations report: open orders, balance due and urgent tickets across the top, then survey outcomes, open orders by stage, weekly activity and what is holding up installs.

Recorded in the appOperations report

Where every open order stands today, what is owed and what is holding up a fit.

DControl

Sign-in
Passkeys, or a password with two-factor.
Roles
Your own roles and permissions. Each person sees the screens their job needs.
Branches
Each branch sees its own leads and orders.
Record
Who did what, and when, on every lead and every order.
Cooling-off
Your cooling-off period, written into every contract.
Devices
Any modern browser on a phone, a tablet or a laptop. Nothing to install.
The activity audit: a dated list of events, each with the customer, what changed and who did it.

Recorded in the appActivity audit

Who did what, and when: every lead, visit and order move is written down as it happens.

10Pricing3 packages

One price for the whole company.

Each package is one monthly price for your organisation, not a price for every seat. Start on the free trial and choose a package when it ends.6

  • Starter

    Design it, quote it and get it signed.

    £249a month, for the organisation

    Promotional offerFirst six months at £149 a month

    • Up to 3 users, 1 branch
    • The 3D designers, for every product you fit
    • Quotes with itemised pricing
    • E-contracts, signed on the customer’s phone
    • Email support

    Set-up fee£299

    Start free trial
  • Professional

    The whole job, from the lead to the fit.

    £499a month, for the organisation

    Promotional offerNo set-up fee

    • Up to 10 users, 2 branches
    • Everything in Starter, and
    • Lead capture and scoring
    • Calendar and surveys
    • Presentations
    • Reports and sales targets
    • Priority support

    Set-up feeUsually £599 with the offer, £0

    Start free trial
  • Enterprise

    For national networks and franchises.

    On requestpriced for your organisation

    • Unlimited users and branches
    • Everything in Professional, and
    • Compliance exports and audit
    • Onboarding and data migration
    • A dedicated success manager

    Set-upQuoted with the package

    Talk to us

FFQuestions8 answers

Before you start.

The questions window companies ask first. Something else? Ask us.

01Will it work with my products and prices?

Yes. You load your own rates for each product, as a size matrix, price bands or a rate card, with your own options and extras. You choose which colours, glass and hardware your reps can pick.

02What does it cost?

Starter is £249 a month for the whole organisation, with a £299 set-up fee. Professional is £499 a month. Enterprise is priced on request. The three packages, and the offers running on them, are set out under Pricing.

03What happens when the trial ends?

Nothing is charged, because no card is taken. Choose a plan to carry on. If you don’t, the trial stops, and your administrators can still sign in to export your data for 30 days.

04How long does it take to set up?

Signing up takes a few minutes: your company’s name and an email address. The trial starts when you confirm the email. To see it with your own products first, book a demo.

05Does the survey work with no signal?

Yes. It saves on the tablet as the surveyor goes, and syncs when the signal is back.

06Does the customer need an app to sign?

No. The quote arrives as a link. They read it, see their right to cancel, type their name and tick Sign and accept.

07Does it replace building control?

No. It checks each window and door against seven rules as it’s surveyed, and names the rule, so a problem is caught before the factory. It’s a guide for replacement windows and doors in England, not a building control decision.2

08Who can see what?

You decide. Roles and permissions are yours to set, each branch sees its own work, and every change is recorded with who made it and when.

11Start3 steps

Try it on your next job.

The free trial is the whole platform, for up to five people. No card is taken and nothing is charged automatically.3

Start free trial Book a demo with your own products

+ What happens next

  1. 01Tell us your companyA name and an email address.
  2. 02Confirm your emailThe trial starts the moment you do.
  3. 03Design your first windowThen quote it.

How it’s built

Composite door

01 / 06

Draw the opening